The Company has established a Most modern and state of the Art 80 KLPD Capacity Distillery Plant to manufacture ENA/Industrial Sprits/Ethanol from Molasses and Grains. The company has installed 24 TPH Spent Wash Incineration Boiler as a part of Zero Effluent Discharge along with 2.4 MW Captive Power Plant in order to meet the Steam and Power Requirements of the Distillery Plant.
The Distillery Effluent called Spent wash will be concentrated in the Integrated Evaporation plant to concentrate to 60 % solids and the same will be burnt in a specially designed Boiler to produce steam and power.